Page 17 - SAMA Quality PLAN
P. 17

Sama Global Quality Management Plan                                           January 2023

Table 1. Sama Global QC Forms and Reports

Form No. Name of Form‫ﻟﻤﯿـــــــﺔ‬S‫ﻌﺎ‬A‫اﻟ‬M‫ـﺎ‬A‫ـــ‬G‫ـــ‬L‫ـــ‬O‫ﻤ‬B‫ﺳ‬ALPurpose                        Reference to QC Plan
1 Definable Features of Work                                                              Section 10
                                       List features of work that are separate and
2 Material Approval Submittal          distinct from any other work                       Section 10
3 Submittal Register                                                                      Section 10
4 Submittal Log                        Tracking, Submittal, and Approval Document         Section 10
5 Transmittal Form                                                                        Section 10
                                       Document and track submittal actions
6 Testing Plan & Log                                                                      Sections 7 and 10
                                       Documents all incoming submittals
7 Test Record                                                                             Sections 7 and 10
8 Preparatory Meeting Agenda           Documents transmittal of all items and reports to  Sections 6 and 10
                                       the Client
9 Preparatory Phase/Meeting                                                               Sections 6 and 10
             Log                       Plan, document, and track materials testing
                                       actions                                            Sections 6 and 10
10 Initial Phase Meeting Form
                                       Document Test Performed and by Whom                Section 10
11 Contractor Production Report
                                       Minimum Points of discussion for Preparatory       Sections 6 and 10
12 Contractor Quality Control          Meeting
             Report (Follow-up Phase)                                                     Section 10
                                       Track the Prep Meetings, related actions and
13 Request for Information             follow-up action                                   Section 10
                                                                                          Sections 6, 8, 9, and
14 Request for Information Log         Record items of discussion/agreement at the        10
15 Rework Log                          initial phase meeting                              Section 10
                                                                                          Section 10
16 QC Meeting Agenda                   Documents daily site conditions, construction
17 Pre-final/Final Checklist           activities, safety, subcontractor staffing/hours   Sections 6 and 10
                                       worked, equipment and materials on site
18 Safety Inspection (checklist)
                                       Ongoing inspection to ensure compliance with
                                       contract requirements, and safety requirements.

                                       Used to ask for clarifications of contract
                                       requirements.

                                       Track status of RFI

                                       Documents all deficiencies, QC action, accepted
                                       resolution and date resolved

                                       Provides Minimum Points of Discussion

                                       Documents items to be corrected (punch list)
                                       and correction accomplished as work is prepared
                                       for turnover to client.

                                       Documents daily site safety inspections

5. QUALITY CONTROL AUDITS AND CORRECTIVE ACTION PLANS

The PLQCMs establish schedules and procedures for conducting QC audits and actually perform the audits.
The purpose of such audits is to determine internal compliance with stated requirements, as defined in this
QMP, as well as compliance with the CQC Plan and contractual requirements. The audits also evaluate the
adequacy of operational methods and compliance with established procedures. Detailed Audit Policy is
found in Sama Global's Audit Policy (standalone documentation).

5.1 Audits

An audit report with observations, findings, recommendations, and corrective action due dates is prepared

and distributed at the completion of each audit to the Program Manager, PM, and site personnel. Audit

findings shall, at a minimum, cover the following:

 Definable Features of Work                         Testing Plan and Log

     Three Phase Checklist                                       Submittals             Page 15 of 36
Revision C                                 For Sama Global Use Only
   12   13   14   15   16   17   18   19   20   21   22